mail@mabbaz.com Abu Dhabi, UAE

Blog

Posts tagged: KPIs

Showing posts filtered to KPIs. Show all posts.

Reliability Sep 27, 2026
Failure Rate: Formula, Calculation and Examples
What failure rate measures, how to calculate it, its relationship to MTBF, why the constant rate assumption is often wrong, and how to read a hazard rate.
Reliability Sep 27, 2026
MTTF: Mean Time to Failure, Formula and Examples
What MTTF means, why it applies to items that are replaced rather than repaired, how it differs from MTBF, and how to calculate it with worked examples.
Reliability Sep 27, 2026
OEE Formula: Availability, Performance and Quality
The OEE formula worked end to end: calculating availability, performance and quality, why ideal cycle time sits in the numerator, and how OEE gets inflated.
Reliability Sep 27, 2026
MTTR Formula: How to Calculate MTTR With Examples
The MTTR formula with worked examples, which clock to start and stop, how waiting time distorts it, and why two sites cannot compare MTTR without definitions.
Reliability Sep 27, 2026
MTBF Formula: How to Calculate MTBF With Examples
The MTBF formula worked through with examples, what counts as operating time, how to treat a fleet of identical units, and the mistakes that skew the result.
Reliability Sep 27, 2026
OEE: Overall Equipment Effectiveness Explained
What OEE is, how availability, performance and quality combine, the six big losses behind it, and the definitional choices that make OEE comparisons useless.
Reliability Sep 27, 2026
MTTR: Meaning, Formula and How to Improve It
What MTTR really measures, the four different clocks people call MTTR, why the boundary you pick changes the number, and how to genuinely improve it.
Reliability Sep 27, 2026
MTBF: Mean Time Between Failures Explained
What MTBF measures and what it does not: why it applies to repairable items, why it is not a lifetime, and the assumptions that make it easy to misread.
CMMS Sep 25, 2026
Maintenance Backlog and Downtime Tracking
Maintenance backlog measured in crew-weeks, why zero backlog is a bad sign, backlog segmentation and ageing, plus downtime reason codes that survive scrutiny.
Business Central Jul 16, 2026
Business Central Financial Reporting: Account Schedules and Beyond
Building financial statements and management reports inside Business Central: financial reports, row and column definitions, dimensions and Excel.

Newsletter

Get new posts by email

A short note when I publish a new guide on enterprise tech, integration, or applied AI. No spam, unsubscribe anytime.

MAbbaz.com
© MAbbaz.com